A shell-and-tube heat exchanger can provide reliable continuous cooling for a high-flow process-water circuit. Based on the stated operating conditions, the exchanger must cool 432 m³/h of process water from 41.42°C to 35°C using 600 m³/h of cooling water entering at 25°C. Both circuits have a maximum allowable pressure drop of 0.3 bar and a maximum allowable working pressure of 3 bar.
The process water is assigned to the tube side, while cooling water flows through the shell side. This arrangement allows the process water to remain inside SS304 tubes with a minimum internal diameter of 18 mm. The shell-side casing is specified as carbon steel, providing a practical construction for a large industrial water-to-water exchanger.
The calculated process-water mass flow is approximately 120 kg/s. Cooling this water by 6.42 K requires a heat-transfer duty of approximately 3,220 kW. The final rating should normally include an appropriate thermal margin, so a nominal capacity of approximately 3.3–3.5 MW may be considered, subject to the required design standard and fouling conditions.
The cooling-water outlet temperature is not specified, but it can be estimated from the energy balance. A cooling-water flow of 600 m³/h is equivalent to approximately 166.7 kg/s. Absorbing 3,220 kW will increase its temperature by roughly 4.6 K, resulting in a preliminary cooling-water outlet temperature of approximately 29.6°C.
This calculated outlet temperature creates a hot-end approach of approximately 11.8 K between the incoming process water at 41.42°C and the leaving cooling water at 29.6°C. At the opposite end, the process water leaves at 35°C while the cooling water enters at 25°C, giving a 10 K approach.
A counter-current arrangement provides a logarithmic mean temperature difference of approximately 10.9 K. This is a suitable thermal driving force for a water-to-water shell-and-tube heat exchanger, but the final required surface area depends on tube material, tube layout, water velocities, baffle spacing and fouling allowances.

For clean water service, a preliminary overall heat-transfer coefficient may fall within a broad range of approximately 800–1,500 W/m²·K. This indicates that the required heat-transfer surface could be roughly 200–370 m². The exact area must be determined from the water analysis and a complete thermal rating rather than from a general coefficient alone.
The large process-water flow and low allowable pressure drop make tube-side circuiting particularly important. With a minimum tube internal diameter of 18 mm, each tube provides an internal flow area of approximately 0.000254 m². Maintaining a water velocity around 1.5–2.0 m/s would require approximately 240–315 tubes in parallel for each tube-side pass.
A two-pass arrangement could therefore require approximately 480–630 tubes, depending on the final internal diameter and target velocity. Increasing the number of passes raises water velocity and improves heat transfer, but it also increases pressure drop. The final pass arrangement must keep the total tube-side pressure loss below 0.3 bar, including entrance, exit and return-channel losses.
Tube velocity should not be selected solely to maximize heat transfer. Excessive velocity increases erosion risk and pump power, while insufficient velocity can promote sediment accumulation and biological growth. The actual water quality, suspended solids and cleaning frequency should be considered when setting the design velocity.
SS304 tubes are suitable for many treated process-water systems, but material compatibility must be confirmed from the chloride level, pH, conductivity, dissolved oxygen and chemical additives. If the process water contains significant chlorides or aggressive contaminants, SS316L, duplex stainless steel or another resistant alloy may be required.
The shell-side carbon-steel construction also requires attention because cooling water can corrode unprotected carbon steel. A suitable corrosion allowance, internal coating or water-treatment program should be considered. If the cooling water is untreated, brackish or saline, carbon steel may not provide the required service life.
The tubesheet requires a compatible construction. A carbon-steel tubesheet with stainless steel cladding or weld overlay can reduce material cost while maintaining corrosion resistance on the process-water side. Direct contact between stainless steel tubes and carbon-steel components should be reviewed for galvanic effects, particularly when the cooling water has high conductivity.
Tube-to-tubesheet joints may be mechanically expanded, seal-welded or expanded and welded depending on leakage requirements. If cross-contamination between process water and cooling water is unacceptable, a welded-and-expanded joint can provide additional security. The fabrication procedure should avoid damaging the relatively thin stainless steel tube wall.
The shell-side baffle arrangement must distribute 600 m³/h of cooling water uniformly across the tube bundle. Poor distribution can create stagnant regions, excessive local velocity and vibration. Baffle spacing, baffle cut and nozzle orientation should be selected through both thermal and mechanical analysis.
Because the shell-side pressure drop is limited to 0.3 bar, the exchanger will need sufficiently large shell-side nozzles and flow passages. A larger shell can reduce velocity and pressure loss, but it also increases equipment size, weight and cost. The final design should balance shell diameter, tube length, number of shells and overall footprint.
The moderate operating temperatures result in relatively limited differential thermal expansion. A fixed-tubesheet exchanger may therefore be technically feasible and economical. However, a removable tube bundle may be preferred if the shell-side cooling water is prone to scaling or if mechanical cleaning around the outside of the tubes is required.
If a fixed-tubesheet design is selected, shell-side mechanical cleaning will be more difficult. Chemical cleaning connections and removable channel covers should then be included. If the water contains sediment or biological material, a removable bundle or straight-tube floating-head configuration can simplify long-term maintenance.
The maximum allowable working pressure is specified as 3 bar on both sides. The final design pressure must account for maximum pump shutoff pressure, static head, pressure surges and abnormal operating conditions. Hydrostatic test pressures should be established according to the selected pressure-vessel code and design temperature.
Instrumentation should measure the inlet and outlet temperatures on both circuits, flow rates and differential pressures. A rising pressure drop can indicate tube fouling, shell-side blockage or an incorrect valve position. Tracking the temperature approach and calculated duty helps identify gradual deterioration before the required 35°C process-water outlet can no longer be maintained.
Based on the available conditions, the shell-and-tube heat exchanger should be preliminarily rated for approximately 3.2 MW, with an expected cooling-water outlet temperature near 29.6°C. Final selection requires confirmation of water properties, fouling factors, allowable overall dimensions, tube length, nozzle sizes, operating pressure and required maintenance arrangement.