• Product Knowledge
MESSAGE
Submit
What maintenance does a shell-and-tube CDU heat exchanger require?
Time :Sep 24, 2026

A shell-and-tube heat exchanger in a CDU requires regular monitoring and periodic inspection to maintain stable cooling performance. Operators should record the inlet and outlet temperatures, coolant flow rates, pressure drop, pump operation, valve position, leak alarms, and coolant quality on both circuits. CDU systems commonly include filtration, flow monitoring, leak detection, and accessible fill and drain connections to support this maintenance. 


Routine maintenance should include:

  • Cleaning or replacing primary- and secondary-loop filters
  • Checking coolant concentration, conductivity, pH, and contamination
  • Removing air from the system through vents
  • Inspecting pumps, valves, sensors, gaskets, and connections
  • Checking for external coolant leakage or cross-contamination
  • Monitoring changes in pressure drop and temperature approach
  • Cleaning the tube side when fouling or scale reduces performance
  • Inspecting the tube sheet, end covers, and removable bundle during shutdown
  • Performing hydrostatic or individual tube leakage tests when required


The cleaning interval depends on water quality, filtration, operating hours, and fouling conditions. The secondary IT loop should be kept clean and protected from contamination, while the facility-water side may require more frequent filter cleaning or descaling. Any sudden increase in pressure drop, rising coolant temperature, reduced flow, or leak alarm should be investigated immediately.

What maintenance does a shell-and-tube CDU heat exchanger require?